CREEK CIRCLE STREAM STABILIZATION

The project included the installation of a low water crossing, a gabion overflow to an existing bypass channel, filter strips, 2 additional cross vanes and landscaping. The project was designed and constructed according to Georgia Stormwater Management Manual.

Download PDF here: creek-circle-stream-stabilization

 

Client: City of Stockbridge
Location: Creek Circle Road
Value: $210,000.00