Dodson Drive Culvert Repair

Site Engineering contracted with the city of East Point to repair and upgrade an
outdated storm drainage system. The project called for the demolition and removal
of the existing cmp, concrete and asphalt.
This project called for the installation of a 11’ x 6’ concrete box culvert and ductile iron pipe.
Site replaced concrete, asphalt and installed permanent grassing in the area. This process
involved demolition of cmp, concrete, asphalt, trees, 405 CY of channel excavation and the
maintenance of the stream flow.

Download PDF here: Dodson Drive Culvert Repair

 

Client: The City of East Point
Location: East Point, GA
Value: $362,380.00