HARVARD AVENUE WATER/SEWER MAIN

Site Engineering contracted with College Park in an Annual on Demand Contractual Water 7 Sewer Services contract. Harvard Ave Water/Sewer Main was part of said annual contract.

The project included replacing 1,136 lf of 1⁄2-inch water main with an 8-inch DIP; two (2) 8-inch gate valves, box markers, nine bends and five (5) tapping sleeve and valves. The project also included two (2) fire hydrant assemblies, replacing twenty-five (25) water meters and replacing 375 lf of 6-inch sanitary sewer with 8-inch DIP and reconnecting to existing service.

Download the PDF here: harvard-avenue

 

 

Client: City of College Park
Location: Harvard Avenue, College Park, GA
Value: $290,248.20