PLANTATION TRACE & BELLS FERRY ROAD

Site Engineering contracted with Cherokee County for a pipe rehabilitation project at Bells Ferry Rd and Plantation Trace.

The project included 80 lf of 48” HTPE, 2 – 100 lf of 84” CMP along with 80 lf of 60” Arch CMP. Also, included removing the inner bands at each joint of pipe and installing manhole ram neck then reinstall the inner bands with screws, stream bank stabilization, installation of gabion mattress in front of the gabion head wall, and restoration of landscaping.

Download PDF here: plantation-trace-and-bells-ferry-road

 

Client: Cherokee County
Location: Woodstock, GA
Value: $311,960.00