Creek Circle Stream Stabilization

Location: City of Stockbridge
Contract Amount: $210,020
Owner: City of Stockbridge

CC15-2

CC15-1

CC15

Site Engineering contracted with the City of Stockbridge to construct approximately 150 If of stream restoration located behind a residential subdivision.

The project included the installation of a low water crossing, a gabion overflow to an existing bypass channel, filter strips, 2 additional cross vanes, and landscaping. The project was designed and constructed according to Georgia Stormwater Management Manual.

Work Performed:
  • Low Water Crossing
  • Cross Vanes
  • Bypass Channel
Owner Contact: Kevin Walter
Engineer: Jacobs Engineering / Paul Purcell
SEI Project Manager: Paxton Billingsley