DeKalb Annual Storm Drainage Infrastructure

Location: DeKalb County
Contract Amount: $211,628
Owner: DeKalb County

23DC-2

23DC-1

23DC

Work performed as part of Site Engineering’s annual Storm Drainage Infrastructure contract with DeKalb County. Various locations throughout DeKalb County including Bahia Mar Circle.  Project consisted of demolition of 288lf of existing 30” CMP and replacement with new 36” RCP. Site Engineering also did trenchless sliplining of 150lf 30” CMP with 24” fused HDPE.  The new RCP pipe was tied into a pre-cast manhole Site Engineering also installed. Once the pipe was laid, the disturbed area was covered with sod.

Work Performed:
  • Storm Sewer
  • Open Cut 36in RCP
  • Slip Line 24in HDPE
  • Paving
  • Erosion Control
  • Sod
Owner Contact: Meski Zewdie
Engineer: Cornell Brown
SEI Project Manager: David Hess