Site Engineering installed a trash collection device to capture floating litter/trash/debris on the South River. The device included a removable litter collection basket for ease in disposal of collected materials and debris. In addition to installing the trash trap, Site Engineering installed a concrete crane pad, a 25-foot walkway to access the trash trap, handrails on the trash trap, and a 12-foot gravel path for easy pedestrian access for future maintenance of the trash trap.