Kendrick Lane Lift Station Phase out

Site Engineering Contracted with Forsyth County to decommission a sewer lift station. Work preformed 286LF of PVC and DIP pipe, the installation of a Manhole, and reconnect existing sewer line into the gravity sewer line. Demolish of the exciting pump station and restoration of the area with curb and gutter, sidewalks, grass and seed, and tree removal. Site Engineering had to maintain traffic control throughout the project.

Downloadable PDF: Kendrick Lane Phase out

 

Client: Forysth County
Location: Cumming, Ga
$237,943.60