ProjectsOUR PROJECTS

As one of Georgia’s top municipal contracting companies, we ensure that we have the right team members available to make each project a success.

Our feature projects represent the credentials, experience and resources to tackle any size utility infrastructure project.

Paces Valley Sewer Improvement and Stream Restoration

Site Engineering rehabilitated Nancy Creek through the City of Atlanta. Previously installed gabion baskets were improperly installed and were in a state of collapse

Read more

North Powers Ferry Rd. Streambank Repair & Culvert Replacement

Site Engineering contracted with Sandy Springs to rehab the existing storm detention facility in the Crossroads Manor Subdivision.

Read more

Fulton County Annual Standby Wastewater System Service

On standby for miscellaneous construction for varied projects throughout Fulton County including stream restoration.

Read more

Dobbins Air Reserve Base Box Culverts

Quadruple Culvert 10’x9’ wingwalls, Parapets, and 200lf Gabion bank armor stabilization, shoring, road shoring.

Read more

Standby Water System Services

Site Engineering worked on various locations throughout Fulton County, GA maintaining, replacing, and upgrading the domestic water system services. 

Read more

McNutt Creek Sewer Connector Phase II

Site Engineering contracted with Oconee County to install the McNutt Creek Sewer Connector Phase II consisting of 9,800 lf of 18” diameter Gravity Sewer Main.

Read more

Ronald Regan Park Stream Restoration

The Park setting raised a high bar for the final visual appeal of the stream restoration. The maintained manicured lawns and ornamental landscaping proved a challenging backdrop to blend into.

Read more

Bush Creek Stream Restoration

Site Engineering contracted with Gwinnett County to repair the Chattahoochee tributary stream Bush Creek in Duluth, Ga. 3,500 linear feet of stream were repaired through a sensitive residential neighborhood.

Read more

One Time Stream Cleanup of South Fork Peachtree Creek, Snapfinger Creek, & South River

One hundred and forty one (141) individual work site locations along the three water sheds were assessed and rehabilitated.

Read more

Sugar Hill Lane Storm Drainage Rehabilitation

Approximately 300LF of various sized Reinforced Concrete Pipe (RCP), two head walls and three manholes were installed by SEI, as well as a tie-in to an existing drop inlet.

Read more

Dodson Drive Culvert Repair

Site Engineering contracted with the city of East Point to repair and upgrade an outdated storm drainage system. The project called for the demolition and removal of the existing cmp, concrete and asphalt.

Read more

BEAVER DRIVE STORMWATER IMPROVEMENT

Site Engineering contracted with Douglas County to upgrade an outdated storm drainage system. Approximately 56 linear feet of old corrugated metal pipe was removed and replaced.

Read more

SPALDING SQUARE STREAM RESTORATION

Spalding Square Stream Restoration project was squeezed in between two town home developments. The proximity to inhabited residences would prove challenging throughout the project.

Read more

PROMENADE VISTA

Site Engineering contracted with Ga State Financing & Investment Commission to complete the site work and storm drainage for the Promenade Vista on their North Ga College and State University Campus.

Read more

NORTHWEST WATERLINE AND SANITARY SEWER

Contracted by College Park to upgrade one of its historic neighborhoods water main system.

Read more

MASON MILL HISTORIC DECATUR WATERWORKS WATERSHED RESTORATION

Site Engineering was contracted to restore a water treatment plant that had set abandoned for 50 years inside of Mason Mill Park.

Read more

Laurel Park Lake Dredging and Spillway Replacement

The Laurel Park project consisted of rehabilitating the park and surrounding park amenities while the non-construction areas of the park remained open to visitors.

Read more

PINE VALLEY DRIVE EMERGENCY WORK

Fulton County contacted Site Engineering informing us of a 48” Sanitary Sewer main collapse and failure in 3 locations including multiple sink holes and the collapse of Pine Valley Drive roadway.

Read more

PLANTATION TRACE & BELLS FERRY ROAD

Plantation Trace and Bells Ferry Road project was a 200 lf, 84” CMP sewer rehabilitation that included a streambank stabilization.

Read more

ROSWELL MILL WATERFALL PIPE

This sewer project consisted of 600 lf of aerial sewer, consisting of 24’ RCP and setting up a bypass system for point repairs.

Read more

ALLENHURST PH STREAM RESTORATION

Site Engineering contracted with Gwinnett County and restored approximately 2,100 linear feet of stream restoration on unnamed tributaries to the Chattahoochee River.

Read more

CREEK CIRCLE STREAM STABILIZATION

Contracted by the City of Stockbridge to restore 150 lf of a stream located behind a residential subdivision that had been rerouted by the developer.

Read more