Fulton County Standby Water System Services

Location: Fulton County, GA
Contract Amount: $1,057,000
Owner: Fulton County

FW11

FW11-1

FW11-2

Site Engineering worked on various locations throughout Fulton County, GA maintaining, replacing, and upgrading the domestic water system services. 5,400 linear feet of water mains from 8in through 54in diameter were installed in the challenging urban conditions of Fulton County. Site Engineering installed 54in diameter lock joint ductile iron pipe along Johns Creek in northern Fulton County. Careful planning with the City’s traffic engineers produced a detour plan and work schedule to enable the installation of this large-diameter pipe safely in close proximity to school bus routes.

Work Performed:
  • Domestic Water main
  • Valves, fittings, services
  • Open cut installations
  • Diameters: 8in-54in
  • Detour Route
  • Stream Restoration
  • Paving, gabions
Owner Contact: Ray Wooten
Engineer: Fulton County
SEI Project Manager: Paxton Billingsley