Laurel Park Lake Dredging and Spillway Replacement

Location: Marietta, GA
Contract Amount: $638,000
Owner: City of Marietta

LP11-2

LP11-1

LP11

Site Engineering rehabilitated the Laurel Park Lake and surrounding park amenities for the City of Marietta. The project involved dredging of the lake and off-site removal of the lake sediment. Project construction occurred while the non-construction areas of the park remained open to visitors. In addition to rehabilitating the Lake at Laurel Park, Site Engineering installed the following amenities: New spillway structure with faux stone finish, spillway energy dissipater, boardwalk, pedestrian bridge, pedestrian path removal and replacement, sanitary sewer replacement, and fencing.

Work Performed:

Lake Dredging

Spillway Structure

Sanitary Sewer

Pedestrian Bridge

Spillway Energy Dissipater

Boardwalk

Owner Contact: Rich Deckman
Engineer: Walden, Ashworth & Associates
SEI Project Manager: David Hess
Previous Project
Key Road Emergency Streambank Restoration
Next Project
Mason Mill/Historic Decatur Waterworks Watershed Restoration