PINE VALLEY DRIVE EMERGENCY WORK

Site Engineering contracted with Fulton County for emergency repair of an existing 48” Sanitary Sewer main collapse and failure in three (3) locations at the downstream joint of three (3) existing manholes.

The project included the stabilization of a 20’ diameter sink hole that had eroded 30% of Pine Valley Road, setting up a 40’ bridge allowing for traffic to cross. Temporary 24” bypass pumps were installed with Sunbelt Pump to begin installation of a full bypass pump system. 42” HOBAS pipe was utilized and slip lined thru the existing 48” RCP sewer main.

Download PDF here: pine-valley-drive-emergency-work

 

Client: Fulton County, GA
Location: Union City, GA
Value: $4,044,666.53